Call : 1-800-480-4808

Crenshaw Light Rail Corridor

 

Los Angeles Metro
Location: Los Angeles, CA
Construction Cost: $5,600,000
Client: Walsh / Shea JV in conjunction with Herzog

The Crenshaw / LAX Transit Corridor Project, an 8.5-mile light-rail line, will run between the Expo Line on Exposition Boulevard and the Metro Green Line serving the Crenshaw Corridor, Inglewood, Westchester, and the LAX area with eight stations, a maintenance facility, park-ride lots, and five power substations.

RMA Group is responsible for the supervision and coordination of inspections and testing on a daily basis, primary review inspection and testing records, and implementation of the Quality Program Manual. To provide test results in a timely manner, RMA Group has provided an on-site laboratory approved by LA City and AASHTO certified.